ROADMAP

The 100-Year Roadmap

From desert validation to Type I civilization. Six phases of the Seed Factory.

Phase 0 · 2026–2028

Desert Validation

~$0.6M
Phase CAPEX
Revenue: AI edge computing revenue
  • ◇Solar sintering + autonomous rover in Pilbara, Australia
  • ◇2-week unattended autonomous run
  • ◇Starlink remote control from 1,500 km away
  • ◇Prove: sand to sintered structure, full remote ops
Phase 1 · 2028–2032

Pilot Desert Factory

~$18M
Phase CAPEX
Revenue: Mining contracts + govt funding
  • ◇Full pipeline: mine → process → 3D print → build
  • ◇D-Shape sand printer for infrastructure
  • ◇6-month unattended continuous operation
  • ◇Prove: autonomous closed-loop manufacturing
Phase 2 · 2032–2040

Lunar Seed Deployment

~$120M
Phase CAPEX
Revenue: NASA/ESA ISRU contracts
  • ◇First lunar lander with FFC reactor module
  • ◇Demonstrate oxygen extraction from regolith
  • ◇Demonstrate metal extraction from regolith
  • ◇Prove: seed can survive and operate on lunar surface
Phase 3 · 2040–2060

Self-Expanding Moon Factory

~$500M–$2B
Phase CAPEX
Revenue: Ultra-pure material sales, science collaborations
  • ◇Factory expands from seed to industrial scale
  • ◇Vacuum semiconductor manufacturing begins
  • ◇ZBLAN fiber production
  • ◇Lunar far-side telescope construction starts
Phase 4 · 2060–2100

Lunar Infrastructure

~$5B–$10B
Phase CAPEX
Revenue: Mass driver launch services, Helium-3
  • ◇Lunar electromagnetic mass driver
  • ◇Helium-3 mining operations
  • ◇Moon becomes industrial hub for cislunar space
  • ◇Metals, oxygen, and water shipped to orbital stations
Phase 5 · 2100–2126

Type I Civilization Dawn

—
Phase CAPEX
Revenue: Full cislunar economy
  • ◇Mars colonization supported by lunar manufacturing
  • ◇Asteroid belt mining operations begin
  • ◇Earth-Moon economy reaches planetary scale
  • ◇Humanity+AI transitions from Type 0 to Type I